No Jenis Penggunaan Unit Pengelola Program Studi (Rupiah) Program Studi (Rupiah)
TS-2 TS-1 TS Rata-Rata TS-2 TS-1 TS Rata-Rata
1 Biaya Operasional Pendidikan
a Biaya Dosen (Gaji, Honor) 12.317.941.368 13.367.237.210 14.074.992.354 13.253.390.311 1.354.973.550 1.470.396.093 1.548.249.159 1.457.872.934
b Biaya Tenaga Kependidikan (Gaji, Honor) 1.910.526.078 1.962.616.932 1.993.491.978 1.955.544.996 1.676.526.078 1.728.616.932 1.757.331.978 1.720.824.996
c Biaya Operasional Pembelajaran (Bahan dan Peralatan Habis Pakai) 1.738.124.000 1.697.542.000 1.255.663.000 1.563.776.333 289.687.333 282.923.666 209.277.166 260.629.388
d Biaya Operasional Tidak Langsung (Listrik, Gas, Air, Pemeliharaan Gedung, Pemeliharaan Sarana, Uang Lembur, Telekomunikasi, Konsumsi, Transport Lokal, Pajak, Asuransi, dll.) 3.517.354.000 5.077.830.000 3.571.601.000 4.055.595.000 586.225.666 846.305.000 595.266.833 675.932.500
2 Biaya operasional kemahasiswaan (penalaran, minat, bakat, dan kesejahteraan). 148.500.000 155.880.000 151.869.000 152.083.000 29.700.000 31.176.000 30.373.800 30.416.600
  Jumlah 19.632.445.446 22.261.106.142 21.047.617.332 20.980.389.640 3.937.112.627 4.359.417.691 4.140.498.936 4.145.676.418
3 Biaya Operasional Penelitian 501.200.000 1.465.000.000 1.298.500.000 1.088.233.333 83.533.333 244.166.666 216.416.666 181.372.222
4 Biaya Operasional PkM 233.610.000 439.282.000 504.931.000 392.607.667 38.935.000 73.213.666 84.155.166 65.434.611
  Jumlah 734.810.000 1.904.282.000 1.803.431.000 1.480.841.000 122.468.333 317.380.332 300.571.832 246.806.832
5 Biaya Investasi SDM 151.264.000 60.076.000 200.875.000 137.405.000 25.210.666 10.012.666 33.479.166 22.900.833
6 Biaya Investasi Sarana 1.559.146.000 754.905.000 217.250.000 843.767.000 259.857.666 125.817.500 36.208.333 140.627.833
7 Biaya Investasi Prasarana 1.801.220.000 2.384.000.000 1.057.250.000 1.747.490.000 300.203.333 397.333.333 176.208.333 291.248.333
  Jumlah 3.511.630.000 3.198.981.000 1.475.375.000 2.728.662.000 585.271.665 533.163.499 245.895.832 454.776.999